Dear ATMers,

The flooring has just been finished. Power line and LAN wire has also been connected. The 16 inch telescope is ready to move in.

Best regards
Chan Yuk Lun
10th March 2009
附加檔案
58.jpg
Plywood base finished.
58.jpg (56.37 KiB) 已瀏覽 3826 次
57.jpg
Plywood base prior to flooring.
57.jpg (125.31 KiB) 已瀏覽 3826 次
56.jpg
Original floor – ugly tiles
56.jpg (105.18 KiB) 已瀏覽 3826 次

Chanlunlun
夸克星
文章: 3839
註冊時間: 週四 09 10月, 2003 21:06

文章 Chanlunlun » 週二 10 3月, 2009 00:49

More pictures ......
附加檔案
61.jpg
The pier, three 220 V power sockets and 2 LAN sockets, ready for the 16 incher to move in.
61.jpg (72.86 KiB) 已瀏覽 3819 次
60.jpg
Flooring finished. It looks good.
60.jpg (73.25 KiB) 已瀏覽 3819 次
59.jpg
Flooring begins.
59.jpg (81.32 KiB) 已瀏覽 3819 次