Dear ATMs,
As per schedule we finished another 2 hours of continuous rough grinding today. Instead of one man doing solo, two boys were enagged a push-pull arrangement in order to save energy and to increase efficiency.
They were powerful labors. After two hours of grinding a f/5.3 curve were obtained. The sagitta becomes 7 mm and 10 more cubic inch of glass was removed which makes up to a total glass removal of 64 cubic inches.
33 cubic inches of glass is to be removed in order to reach the f/3.5 goal. We expect to finish the rough grinding in the next 7 hours.
Best regards
Chan Yuk Lun
10-2-2004
12 hrs of rough grinding on 24 in mirror
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
12 hrs of rough grinding on 24 in mirror
- 附加檔案
-
- Two boys were engaged into a push-pull arrangement for the rough grinding of the mirror. A third boy was feeding the mirror with carbo. This arrangement can save time and enhance efficiency.
- push_pull.jpg (65.5 KiB) 已瀏覽 7864 次
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
-
- 夸克星
- 文章: 3847
- 註冊時間: 週四 09 10月, 2003 21:06
Dear Mr. Wah!,Wah! 寫:推住好辛苦....
Actually they enjoyed it since they can communicate with each other for TWO CONSECUTIVE HOURS during work. I really cannot imagine where else could they get such chance of facing each other for that long.
Again, don't trust their faces. They pretended to be in pain when I took the shot.
Best regards
Chan Yuk Lun
11-2-2004
誰在線上
正在瀏覽這個版面的使用者:沒有註冊會員 和 5 位訪客